Alleyway
STATUS:
COMPLETE

BEGUN:


COMPLETE:



MATERIALS:

2 slabs Masonite
Masking liquid.
Fleck Stone.
1 Lazy Susan.
Krazy glue.


CONSTRUCTION LOG

061101
All the pieces are there, the next step: drill up the brick mortar for rugged look. When Faye is assembled, trace her footsteps and mask. Spike's footsteps are already masked. Then, spray the base with Fleck Stone. Give the overall piece several washes. Glue the characters down. Finished. Add bracing later?


061231.03
The above says it well. Drilled up the mortar earlier this evening. Looks good. The washes are going to be very good. May Fleck whole thing again, but would lose the red brick of wall... Faye is nearly ready.


070101.06
Faye is ready for posing. Set her feet and masked the ground. Fleck Ston'd the ground. Then, black washes on the whole. Done.


070103.03
Black washes and finished. Fleck ground looks good! Foot masks are tight enough.


070103.18 complete.


Return to Dioramas